Specialist Generator Installation Using Our Gantry System
Our SL60 Gantry System enabled the safe installation of a heavy generator, attenuation unit and silencer within a restricted-access level -2 basement.
At Finch of Bookham, we cater to both small-scale and large-scale needs. We don’t discriminate based on the size of the task but instead focuses on delivering exceptional service. Whether you're a small business owner looking to transport a handful of goods across town or a multinational corporation requiring intricate logistics solutions, our company has got you covered.

Our SL60 Gantry System enabled the safe installation of a heavy generator, attenuation unit and silencer within a restricted-access level -2 basement.

Finch of Bookham recently completed a rooftop generator installation using the newest addition to our fleet, the Grove 3060. Carefully planned specialist lifting operations saw the generator safely hoisted from the delivery vehicle and positioned onto the plant deck, demonstrating the precision, capability and reliability of our team and equipment on one of the crane’s first site deployments.

We successfully completed a complex boiler removal and installation project to and from a mezzanine plant room. Using specialist lifting equipment, including roller systems, pallet trucks, forklift jibs and certified lifting gear, we carefully manoeuvred both the old and new boilers within a restricted space.

Our team expertly managed the complex internal installation of a pre-cast ironer pit. The job involved a coordinated lift and precise positioning within an active laundry environment. Drawing on our in-house specialist services, we executed each phase safely and efficiently, from external offload to final placement below ground level.

We successfully delivered, lifted, and positioned three air conditioning units, each weighing approximately 2000kg, at a secure facility, demonstrating precision, care, and seamless coordination.

Finch of Bookham successfully completed a complex alternator and control panel changeover, involving the removal and reinstallation of large generator canopies using a mobile crane. Working within a tight site, the team executed multiple precision lifts over several days, showcasing expert coordination, safety compliance, and specialist handling in restricted conditions.

Finch of Bookham successfully completed a complex alternator and control panel changeover, involving the removal and reinstallation of large generator canopies using a mobile crane. Working within a tight site, the team executed multiple precision lifts over several days, showcasing expert coordination, safety compliance, and specialist handling in restricted conditions.

This project involved the careful manoeuvring of a helicopter within an army facility—an operation requiring meticulous planning, specialised equipment, and skilled execution.

We offloaded, repositioned, and installed a heavy machine in a tight lab space. Using forklifts, A-frame gantries, skates, and precision lifting equipment, we manoeuvred the machine through a window, vertically aligned it, and positioned it securely, ensuring seamless relocation and setup.

At Finch of Bookham, our team expertly managed the removal and installation of a chiller unit at The Deep Aquarium in Hull. Following strict safety and manufacturer guidelines, we executed each lift with precision, from crane positioning to securing AVMs, showcasing reliability and teamwork throughout this unique and challenging project.