Skip to content
Finch of Bookham Logo - Est. 1924
  • Home
  • About Us
  • Services
    • Machine Movers
    • Contract Lift
    • Plant & Machinery Transport
    • Storage and Warehousing
    • Specialist Lifting Equipment
  • Projects
    • Photo Gallery
    • Replacement Generator Delivery
    • Chiller and Redundant Plant Removal
    • Roof Condenser Changeover
    • Manoeuvring of Bespoke Table
    • Gin Distillery Movement and Reinstallation
    • Chiller Delivery and Positioning
    • Chiller Lift
    • Generator Plant Delivery
    • Offloading and Positioning of Two Fuel Tanks
    • Precision Lift System Installation and Atomizer Relocation
    • Chiller Changeover at The Deep Aquarium
    • Posting an Instron Testing Machine Through a Window
    • Relocating a Helicopter with Expert Care
    • Alternator Changeover – Crane Lift & Roof Removal Operation
    • Radiator Module Lift & Reinstallation Using Cube Jack System
    • Delivery, Offload and Handling of Air Conditioning Units on Site
    • Installation of Pre-Cast Ironer Pit in Laundry Facility
    • Precision Boiler Removal and Installation on a Mezzanine Level
    • Generator Lift to Roof Plant Deck
    • Specialist Generator Installation Using Our Gantry System
  • News
  • Contact
  • Home
  • About Us
  • Services
    • Machine Movers
    • Contract Lift
    • Plant & Machinery Transport
    • Storage and Warehousing
    • Specialist Lifting Equipment
  • Projects
    • Photo Gallery
    • Replacement Generator Delivery
    • Chiller and Redundant Plant Removal
    • Roof Condenser Changeover
    • Manoeuvring of Bespoke Table
    • Gin Distillery Movement and Reinstallation
    • Chiller Delivery and Positioning
    • Chiller Lift
    • Generator Plant Delivery
    • Offloading and Positioning of Two Fuel Tanks
    • Precision Lift System Installation and Atomizer Relocation
    • Chiller Changeover at The Deep Aquarium
    • Posting an Instron Testing Machine Through a Window
    • Relocating a Helicopter with Expert Care
    • Alternator Changeover – Crane Lift & Roof Removal Operation
    • Radiator Module Lift & Reinstallation Using Cube Jack System
    • Delivery, Offload and Handling of Air Conditioning Units on Site
    • Installation of Pre-Cast Ironer Pit in Laundry Facility
    • Precision Boiler Removal and Installation on a Mezzanine Level
    • Generator Lift to Roof Plant Deck
    • Specialist Generator Installation Using Our Gantry System
  • News
  • Contact
01372 452711
Screenshot

NightTime Installation of a 14 Metre Cryogenic Air Separation Unit

  • Michelle
  • September 18, 2026
  • News

We regularly lead specialist machinery moving projects where careful planning is just as important as the lifting operation itself.

This project involved the movement and installation of a 14 metre long cryogenic air separation unit, which is a key piece of industrial equipment used to convert atmospheric air into liquid nitrogen.

Why Was the Installation Carried Out at Night?

Due to the exceptional size of the equipment, access to the site was only available during overnight hours.

Working outside normal operating times allowed our team to safely manoeuvre the unit through the restricted access route while minimising disruption to the surrounding area. Detailed planning, route assessments and coordination with the client ensured the installation could be completed efficiently within the available access window.

Specialist Machinery Moving

Transporting and positioning equipment measuring 14 metres in length requires considerably more than simply unloading it from a vehicle.

Our experienced team carefully manoeuvred the unit through the site using specialist machinery moving techniques, ensuring complete control throughout every stage of the operation. Every movement was carefully coordinated to maintain clearances, protect the equipment and safely navigate the restricted working environment.

Once the air separation unit had reached its final location, we accurately positioned it in readiness for the next phase of the client’s installation programme.

Precision Planning for Complex Installations

Projects of this nature demonstrate the importance of detailed lift planning, experienced operators and specialist equipment.

From route planning and out-of-hours working through to the final positioning of oversized industrial plant, Finch of Bookham provides complete machinery moving and contract lifting solutions for complex installations across the UK.

Whether working in live production facilities, restricted-access sites or challenging industrial environments, our team has the experience and specialist equipment to safely handle large, heavy and high-value machinery with the care and accuracy needed.

PrevPreviousSupporting a 48-Ton Generator Through Factory Acceptance Testing
Road Haulage Association (RHA) Certified
ISO 9001 Registered
CHAS Accredited
CPA Accreditation
CPCS Accreditation
FORS Gold
Safe Contractor Approved
White Finch of Bookham Brandmark Celebrating 100 Years

Registered Address: W. Finch & Co Ltd, The Homestead, Eastwick road, Great Bookham, KT23 4BA.

Instagram Youtube
  • About
  • Machine Movers
  • Contract Lifting
  • Plant & Machinery Transport
  • Storage & Warehousing
  • Specialist Lifting Equipment
  • Our Work
  • Privacy Policy

Contact

01372 452 711

info@finchofbookham.co.uk

We are a rapidly growing company that is always looking to expand our team. If you’re interested in joining, please send us your CV.

© W. Finch & Co Ltd 2026

Built by Elliptycs